
Electricals & Electronics · NSE
Arc Insulation and Insulators Limited, established in September 2008, manufactures high-performance glass fiber reinforced polymer (GFRP) products that are durable, lightweight, and corrosion-resistant. Its range includes rebars, tubes, gratings, and fencing, widely used in infrastructure, power, cooling towers, chemical plants, electrical substations, mining, and marine construction. The company’s ISO 2015-certified facility in Ramdevpur Village, West Bengal, is equipped with advanced testing machines to ensure quality standards. A team of eight skilled engineers specializing in mechanical, structural, civil, and quality fields oversee production to maintain product reliability and customer satisfaction.
Price Band
₹119 – ₹125
Issue Size
₹41.19 Cr
Lot Size
1000 shares
GMP
+64.0%
Est. Listing
₹205
at current GMP
Subscribed
18.82x
overall
Open
21 Aug 2025
Close
25 Aug 2025
Allotment
26 Aug 2025
Refund
27 Aug 2025
Demat Credit
28 Aug 2025
Listing
29 Aug 2025
Designated Registrar: Maashitla Securities Private Limited
Allotment Date
26 Aug 2025
Basis finalization
Refunds Initiate
27 Aug 2025
Mandate release
Demat Credit
28 Aug 2025
Shares in demat
Listing Debut
29 Aug 2025
Trading begins
ARC Insulation & Insulators Limited is bringing an initial public offering (IPO) in the Electricals & Electronics sector with an aggregate issue size of ₹41.19 Crores. The shares are offered at a price band of ₹119 to ₹125 per equity share on NSE. Currently, traders and retail applicants are calculating expected listing gains and break-even points based on unofficial grey market quotations.
Prospective investors can apply in the retail quota with a minimum of 1 lot comprising 1000 shares (approx. ₹1,25,000 minimum investment). High net-worth individuals (HNI/NII) can bid in the sHNI (₹2 Lakh to ₹10 Lakh) or bHNI (above ₹10 Lakh) categories for enhanced quota allocation.
Allotment reconciliation will be managed by Maashitla Securities Private Limited. Eligible allottees will receive credit of equity shares into their Demat accounts by 2025-08-28, while un-allotted funds or UPI block mandates will be released on 2025-08-27.
Allotment records are updated in batches. If the status is not yet available, please wait a few hours until the basis of allotment is fully finalized.
Since funds are blocked under ASBA/UPI, the bank will automatically release the blocked hold on your funds upon receipt of revocation instructions from the sponsor bank.